In Construction Placo inc. c. Kingspan Insulated Panels Ltd., 2021 QCCS 1230, rendered on March 18, 2021, Construction Placo inc. [Placo], as cross-defendant, sought an order from the Court requesting Société d’assurance générale Northbridge [Northbridge] to assume its defence and to pay all costs associated with its defence within the scope of the cross-claim.

In April 2016 within the scope of the construction of the aquatic complex at Havre-Saint-Pierre, Cégerco inc., as general contractor, retained the services of Placo, as subcontractor, for the installation of the exterior cladding. The subcontract awarded to Placo provided that the exterior cladding would be comprised of metallic insulated panels manufactured by Kingspan Insulated Panels Ltd. [Kingspan]. In virtue of the contract, the work had to be carried out between October 15, 2016, and December 15, 2016. According to Cégerco, Placo failed to respect its obligations and failed to follow the schedule, which caused lengthy delays. Given that Placo advised Cégerco that it was not in a position to deliver the panels before January 2017, Cégerco took temporary measures to protect the work including closing the exterior envelope of the building. In January 2017, when the panels were delivered by Placo, Cégerco maintained that the panels delivered did not meet the specified requirements and, consequently, refused them. This led to different steps being taken to try to find a solution to the problem although without success. On May 24, 2017, Cégerco proceeded to the resiliation of Placo’s contract. It obtained the panels directly from Kingspan and hired a third party to finish the work.

Placo instituted legal proceedings against Kingspan to recover the deposit for the manufacturing of the panels and then against Cégerco for damages flowing from the resiliation of the contract. In its defence, Kingspan took a cross-claim for transportation costs. In October 2019, Cégerco also took a cross-claim against Placo requesting $1,783,252 corresponding to the damages allegedly sustained as a result of Placo’s faulty execution, which caused numerous delays and additional costs.

Northbridge concluded that there were no covered material damages within the meaning of the liability policy, given that the allegations were essentially related to the inexecution of contractual obligations or redoing work as well as the delays resulting from same.

The Court’s analysis

The Court analyzed the principles applicable to a Wellington motion and noted that, as a general rule, liability policies provide three cumulative conditions for the insured to benefit from the insurance, namely:

  • the occurrence of material or bodily injuries within the meaning of the policy;
  • the fact that material damages result from a covered loss;
  • the fact that the material damages occur within the period of coverage.

The Court noted that the insured did not benefit from coverage if the claim was solely for costs related to the poor execution of the work whereas no covered loss occurred.

The Court underlined that in order to determine whether Placo benefitted from insurance coverage, it had to assess if, during the period of the policy, the proceedings and the exhibits establish a possibility of an occurrence of material or bodily damages resulting from a loss within the meaning of the policy. In the affirmative, the Court had to address whether the exclusions apply.

To respond to these questions, the Court had to analyze the true recourse of the cross-claims. First, the cross-claim of Kingspan against Placo to recuperate an amount of $25,986.36 for transport fees could not be covered in the absence of material damages and of a covered loss.

With respect to the cross-claim of Cégerco, the Court reviewed the proceedings and noted that Placo had to provide materials and labour for the execution of the subcontract. Cégerco alleged that the exterior wall panels were finally installed one year later than provided for, and that the default and inexecution of Placo caused numerous delays and additional costs to Cégerco. The cross-claim of $1,783,252 was essentially a claim for loss of productivity for which Placo was allegedly responsible.

Were there any material damages?

The Court concluded that the damages claimed were not material damages within the meaning of the policy. There was no deterioration or destruction of a corporal property. The panels were not installed with the exception of a few and could not cause deterioration or destruction. Furthermore, given that the construction was not completed there was no loss of enjoyment which resulted; besides, only the owner of the building could invoke a loss of enjoyment. It is the delays of Placo in its execution of the contract which provoked the claim in compensation from Cégerco. Pure economic damages which flow from inadequate performance of the product of the insured are not a consequence of the loss. They result from normal and foreseeable incidents which could occur in the normal course of the activities of all enterprises.

The Court underlined that this case is distinguished from Progressive Homes Ltd. v. Lombard General Insurance Co. of Canada, 2010 SCC 33, [2010] 2 SCR 245 in that Placo did not execute the essence of its contract towards Cégerco. The panels were not installed, with the exception of a few and were not the cause of deterioration.

The Court concluded that Northbridge was under no duty to assume Placo’s defence.

209

Authors

Mariella De Stefano

Lawyer, Partner and Co-chair of the Insurance Law Group

Articles in the same category

An Insurer Is Not Required to Uncover What the Insured Was Required to Disclose

In Kayembe-Kabeya v. Industrielle Alliance, assurance et services financiers inc., 2026 QCCS 1714, the Superior Court sets the record straight on the principle of contractual “utmost good faith”. The Facts In September 2019, Ms. Ricady Mede (hereinafter “Mede”) purchased a life insurance policy from Industrielle Alliance (hereinafter the “Insurer”). A few months later, she died of […]

When it’s too late for latent defects…

The Superior Court recently rendered a judgment in Reinert v. Construction Maurice Bilodeau Inc., 2026 QCCS 2276, dealing with timeliness to give notice in cases of latent defects. The Facts In 2013, Ms. Sylvie Reinert and Mr. Denis Leclerc retained Construction Maurice Bilodeau Inc. (“CMB”) for the construction of a residential building on a vacant lot in Lévis. […]

Insurance Math: One Claim, Two Fires, Three Points of Origin, Zero Recovery: When Circumstantial Evidence Speaks Louder Than a Confession

In Chatel v. Desjardins Insurance, 2026 QCCS 712, the Quebec Superior Court reaffirmed a principle of insurance law: direct evidence is not required to establish an intentional fault. Mr. Chatel claimed $532,000 under his homeowner’s insurance policy following two fires that occurred four days apart. The first caused partial damage to his residence, while the second […]

The Quarrelsome Litigant: When the Right to Sue Becomes a Scourge

Access to the courts is a fundamental right, but what happens when a person uses it not to assert legitimate rights, but to harass others or clog the system to excess? This is quarrelsomeness: the tendency to exercise one’s right to litigate in an excessive or unreasonable manner. Far from being a marginal phenomenon, it […]

Before Buying a Product, Read This: The Rules Are Changing on October 5!

On October 5, 2026, the final amendments to the Regulation amending the Regulation respecting the application of the Consumer Protection Act (the “Regulation“) are expected to come into force, completing the implementation of the new “good working order” warranty in the province of Quebec. When this warranty applies, the merchant or manufacturer will be required to repair […]

No Notice of Default, No Termination

In Pavage Wemindji Inc. v. Compagnie de Construction et de Développement crie ltée, the Quebec Superior Court emphasized that a valid notice of default (mise en demeure) is not just a formality—it’s a precondition to exercising remedies like contract termination in many cases under Quebec civil law. The Decision The plaintiff, Pavage Wemindji Inc. (“Wemindji”), […]